Just a quick recap (Part 1-5) The holes outside and inside have been patched with metal, foam, and sealed with Titebond sealant. The subfloor has been replaced with insulation. The walls…
Category:
Trailer Renovation
In this section we are working primarily on the butcher block for the kitchen countertop. Phil is cutting the sink out. Then we applied 4 coats of the mineral oil…
Part 4: 1972 Streamline Trailer Renovation We finished the walls, painted the kitchen. Placed the kitchen in and tried the butcher block on it. It looks so good with the…
Part 3 for our Streamline trailer renovation. We have finished most of the walls and stained. The ceiling is completed. The lights are in and working. I am so excited…
1972 Streamline Trailer Renovation Part 2 In this section, we got all our new electrical things completed. We got 10 wall outlets and 2 USB plugins. Our electrical box was…
So….. we bought a vintage 1972 streamline trailer (countess) 27ft. Yes I know I am not blind, it does look super creepy. The amount of change that I already see…
- 1
- 2