1972 Streamline Trailer Renovation Recap Part 1-5

by Veronika B

Sharing is caring!

Just a quick recap (Part 1-5)

  • The holes outside and inside have been patched with metal, foam,  and sealed with Titebond sealant.
  • The subfloor has been replaced with insulation.
  • The walls have been completed with the T&G. Stained with whitewash and Satin Finish was applied.
  • The ceiling has been completed with T&G. Applied Gloss Finish.
  • The trim was placed and we applied the same Gloss Finish as the ceiling.
  • Ceiling lights placed.
  • Speakers placed.
  • Reading lights with wooden detail (found at Home Depot) under it.
  • Kitchen primed and painted and hardware attached.
  • Butcher block countertop with mineral oil.
  • Black sink.
  • Black faucet.
  • Outlets completed and covered (similar covers).
  • Front shelves area  primed and painted.
  • Outdoor vent cover was placed

Follow us on IG to see our streamline journey.

1972 Streamline Trailer Renovation Part 5

1972 Streamline Trailer Renovation Part 4

1972 Streamline Trailer Renovation Part 3

1972 Streamline Trailer Renovation Part 2

1972 Streamline Trailer Renovation Part 1

You may also like

2 comments

Delivering our trailer to our land - Shakan Ranch September 12, 2022 - 11:18 am

[…] Trailer Renovation […]

Reply
1972 Streamline Trailer Renovation Part 8 - Shakan Ranch September 12, 2022 - 1:52 pm

[…] Trailer Renovation […]

Reply

Leave a Comment