1972 Streamline Trailer Renovation Recap Part 1-5

Sharing is caring!

Just a quick recap (Part 1-5)

  • The holes outside and inside have been patched with metal, foam,  and sealed with Titebond sealant.
  • The subfloor has been replaced with insulation.
  • The walls have been completed with the T&G. Stained with whitewash and Satin Finish was applied.
  • The ceiling has been completed with T&G. Applied Gloss Finish.
  • The trim was placed and we applied the same Gloss Finish as the ceiling.
  • Ceiling lights placed.
  • Speakers placed.
  • Reading lights with wooden detail (found at Home Depot) under it.
  • Kitchen primed and painted and hardware attached.
  • Butcher block countertop with mineral oil.
  • Black sink.
  • Black faucet.
  • Outlets completed and covered (similar covers).
  • Front shelves area  primed and painted.
  • Outdoor vent cover was placed

Follow us on IG to see our streamline journey.

1972 Streamline Trailer Renovation Part 5

1972 Streamline Trailer Renovation Part 4

1972 Streamline Trailer Renovation Part 3

1972 Streamline Trailer Renovation Part 2

1972 Streamline Trailer Renovation Part 1

2 responses to “1972 Streamline Trailer Renovation Recap Part 1-5”

Leave a Reply

Your email address will not be published. Required fields are marked *

Veronika at Shakan Ranch.

Hi! Iโ€™m Veronika!

Search

Subscribe

Get exclusive access to recipes and cooking tips!





You’ll also love